_index

Microsoft Senior Software Engineer – LLD Daily Plan

Focus: Low-Level Design (LLD) + OOPS + SOLID + Design Patterns
Target: Microsoft Redmond – Senior SDE
Duration: Dec 20 – Jan 31
Exclusions: Sundays, Dec 25, Dec 31, Jan 1
Daily Time: ~90 minutes


🎯 Microsoft LLD Expectations


PHASE 1: OOPS + SOLID + Design Thinking (FOUNDATION)

Day 1 – Dec 20

Topic: Microsoft LLD Interview Mindset

Checklist (60–75 min):


Day 2 – Dec 21

Topic: OOPS Fundamentals (Applied)

Checklist (75–90 min):


Day 3 – Dec 22

Topic: SOLID Principles (Practical)

Checklist (75–90 min):


Day 4 – Dec 23

Topic: Composition over Inheritance

Checklist (60–75 min):


Day 5 – Dec 24

Topic: Interfaces & Dependency Injection

Checklist (75–90 min):


❌ Dec 25 – Christmas (OFF)


Day 6 – Dec 26

Topic: Error Handling & Edge Cases

Checklist (60–75 min):


Day 7 – Dec 27

Topic: Testability & Clean Code

Checklist (60–90 min):


❌ Dec 28 – Sunday (OFF)


PHASE 2: DESIGN PATTERNS (MSFT-FAVORITE SET)

⚠️ Focus on when & why, not definitions

Day 8 – Dec 29

Pattern: Strategy + Factory

Checklist (75–90 min):


Day 9 – Dec 30

Pattern: Singleton (Proper & Improper)

Checklist (60–75 min):


❌ Dec 31 – OFF
❌ Jan 1 – OFF


Day 10 – Jan 2

Pattern: Observer

Checklist (75–90 min):


Day 11 – Jan 3

Pattern: Decorator

Checklist (60–75 min):


❌ Jan 4 – Sunday (OFF)


Day 12 – Jan 5

Pattern: Command

Checklist (75–90 min):


Day 13 – Jan 6

Pattern: State

Checklist (75–90 min):


PHASE 3: CORE LLD PROBLEMS (PATTERNS + SOLID)

Day 14 – Jan 7

Parking Lot – Part 1

Checklist (75–90 min):


Day 15 – Jan 8

Parking Lot – Part 2

Checklist (75–90 min):


Day 16 – Jan 9

LRU Cache

Checklist (75–90 min):


❌ Jan 11 – Sunday (OFF)


Day 17 – Jan 12

Rate Limiter

Checklist (75–90 min):


Day 18 – Jan 13

Elevator System

Checklist (75–90 min):


PHASE 4: ADVANCED MSFT LLD

Day 19 – Jan 14

API Design (LLD Level)

Checklist (60–75 min):


Day 20 – Jan 15

Feature Flag System

Checklist (75–90 min):


Day 21 – Jan 16

Concurrency & Thread Safety

Checklist (75–90 min):


❌ Jan 18 – Sunday (OFF)


Day 22 – Jan 19

Refactoring Exercise

Checklist (75–90 min):


Day 23 – Jan 20

Trade-offs & Decision Defense

Checklist (60–75 min):


Day 24 – Jan 21

Full Mock LLD Interview

Checklist (90 min):


PHASE 5: POLISHING & CONFIDENCE

Jan 22–26

❌ Jan 25 – Sunday (OFF)


Jan 27–30


🏁 Microsoft LLD Rule

Patterns support design — they are not the design.
Readable > Clever
Explainable > Perfect